Bus on Shoulders: Analysis of Preliminary Concept

Three major tasks will be undertaken to assess Bus on Shoulders feasibility in this region.

1. Task One is to identify the major stakeholders with the assistance of a Technical Review Panel. This core group will consist of the decision-makers for the region.
2. Task Two involves conducting structured interviews of the identified stakeholders and will identify issues and concerns anticipated to be major obstacles to implementing BOS operations in the region.
3. Task Three seeks to address issues, concerns, and barriers to Bus On Shoulder implementation in the Chicago region as documented in Task Two.

Principal Investigator(s):

Piyushimita (Vonu) Thakuriah

Participants:

Piyushimita (Vonu) Thakuriah
Jie (Jane) Lin
Paul Metaxatos

Status:

08/10/2010

Objective:

At the current time, several transit agencies around the country are making use of Bus on Shoulders (BOS) as an operating strategy. Pace Suburban Bus has conducted preliminary feasibility work on this topic and has identified several corridors where such a strategy might relieve congestion in the Chicago metropolitan area. However, a more detailed study is required to evaluate institutional issues related to BOS operations and design in the Chicago metropolitan area and potentially identify facilities where BOS strategies can be implemented.

Strategy:

This study will identify and address issues and concerns regarding BOS operations and prioritize highway segments for BOS operations.

Expected Results or Products:

Deliverables include a list of contacts critical for implementing BOS operations in the Chicago region, interim reports documenting obstacles and solutions for BOS implementation, and meetings and workshops to address stakeholder concerns.

Download:

Download the report

Contact:

P.S. Sriraj
Urban Transportation Center
University of Illinois at Chicago
412 South Peoria Street, Suite 340
Chicago, IL 60607
Voice: (312) 996-4713
Fax: (312) 413-0006
Email: sriraj@uic.edu

Sponsors:

Illinois Department of Transportation

Idot logo 2